Three Panel Workstation Fire
Three panel workstation fire time-line
This test was sponsored by the
General Services Administration (GSA)
and performed at
BFRL
in 1991.
Times are in seconds from ignition.
Select a picture to view a larger version.
| 0 min, 30 kW |
1 min, 190 kW |
2 min, 220 kW |
3 min, 260 kW |
4 min, 110 kW |
 |
 |
 |
 |
 |
| 5 min, 150 kW |
6 min, 860 kW |
7 min, 1.0 MW |
8 min, 2.8 MW |
9 min, 6.6 MW |
 |
 |
 |
 |
 |
| 10 min, 3.2 MW |
11 min, 2.1 MW |
12 min, 1.4 MW |
14 min, 630 kW |
16 min, 690 kW |
 |
 |
 |
 |
 |
| 18 min, 480 kW |
22 min, 530 kW |
26 min, 390 kW |
30 min, 370 kW |
34 min, 350 kW |
 |
 |
 |
 |
 |
The fire size in kilowatts versus time
Fire Data
The heat release data for this case is incorporated into
the default one-room case for
CFAST/FASTLite.
If you are running FASTLite,
we suggest that you copy this file into the default
example directory, C:\FLITE .
The data is also available in a
spread sheet (comma delimited) format.
Animations
View a movie of this fire
by downloading one
of the following quicktime or mpeg files.
Using a 14.4 kb modem, it takes about
one minute to download each animation
for every 60 kbytes in size.
These animations were converted from video by
the Scientific Applications Support Group at NIST.
Building and Fire Research Laboratory
National Institute of Standards and Technology
Gaithersburg, MD 20899